SMALL FOOTPRINT DIRECTIONAL DRILLING

Directional Drilling is a cost effective and environmentally friendly solution for many underground installation projects. Instead of digging trenches to lay pipes/ducts and cables EPS Trenchless Installations use a technique called horizontal directional drilling or HDD.

This method involves drilling a pilot borehole along a predetermined bore path. The hole is then enlarged following the path set by the pilot bore, this is known as back reaming. Then the product pipe is pulled in behind this.

Having completed projects on main roads, motorways, SSSI’s, railways, rivers and canals, military bases, nuclear facilities and sporting venues such as Donnington Park, EPS Trenchless Installations has a proven track record in major underground installation projects.

Installation sizes and rates

Pipe sizes range from 25mm to 225mm with distances up to 90m installed in one shot. Directional drilling uses a small footprint with no need for deep excavations and operates through various ground types.

This trenchless method is ideal for the installation of cables and ducts, pumped sewer lines, water mains, oil lines and gas lines under roads, railways, existing structures, congested areas, environmentally sensitive areas and waterways.

INSTALLATION RATES

Metres / day
1

dependent on the required diameter and the ground conditions

distances

Metre pipe lengths
1

(subject to pipe size and ground conditions)

ACCURACY

+/- mm
1

ground dependent

Small footprint process

1. SURVEYING

We start with a detailed survey, site visit and the use of online technology to check geological information

2. PLANNING

From conception to completion EPS will work in partnership with you, planning and advising you on the best way to complete your project

3. DRILLING

From start to finish the drilling process is handled professionally and diligently by our fully qualified engineers

4. COMPLETION

Complete reinstatement and site clearance. We leave the site clean and clear