Client Case Study
BGS Utilities
EPS Trenchless Installations, on behalf of BGS Utilities, successfully installed a 63mm SDR11 gas main beneath a busy dual carriageway in Northampton. Using directional drilling to minimise disruption to traffic and road users, the project was completed quickly in a single morning despite very challenging weather conditions.Â
Project TypeÂ
Gas Main Installation Under Major Road
Trenchless Installation MethodÂ
Horizontal Directional DrillingÂ
RequirementsÂ
Installation of new gas main for industrial unitÂ
Location
NorthamptonÂ
DistanceÂ
50 MetersÂ
CrossingÂ
Busy Dual carriageway near to roundaboutÂ
Drilling SuggestionÂ
1 x 63mm SDR11 Gas MainÂ
ConstraintsÂ
Busy main road with high volume trafficÂ
Existing services presentÂ
Rig usedÂ
Ditch Witch JT3020 Directional DrillÂ
Ground ConditionsÂ
ClayÂ
Installation time
1 DayÂ
BGS Utilities, a leading UK provider of comprehensive utility solutions, excels in project management, ensuring safety, efficiency, and client satisfaction across commercial, housing, and industrial sectors. With over 15 years of experience and recognition from industry governing bodies, they offer tailored services, ensuring projects are delivered on time and within budget. Recently, they partnered with EPS Trenchless Installations Ltd for a Horizontal Directional Drilling (HDD) project, chosen for their unparalleled HDD expertise, promising precision and technical excellence for optimal project outcomes.
The project faced the dual challenges of executing the installation under adverse weather conditions and ensuring minimal disruption to the busy carriageway. The objectives were clear:
The task involved installing a 63mm SDR11 gas main using a Vermeer D9x13 directional drilling rig, known for its precision and reliability.
The project required meticulous planning, including obtaining the necessary permissions and employing GPRS technology to ensure accurate drilling paths and avoid underground utilities.
The bore path was strategically designed to navigate the undercarriage of the dual carriageway, utilizing the rig’s capabilities to overcome the good clay ground conditions, which were ideal for the operation.
The use of a Ditch Witch JT3020 drill was pivotal, chosen for its suitability in cohesive clay conditions—ideal for the gravity installation method.
The installation was completed in just one morning, with the EPS team overcoming poor weather conditions to ensure the project’s success. BGS Utilities was extremely satisfied with the outcome, highlighting the project’s efficiency and the minimal disruption caused to the local area.
This project exemplifies the benefits of HDD in urban utility installations, particularly in challenging environments. EPS Trenchless Installations demonstrated exceptional skill and determination, completing the work swiftly despite adverse conditions. This case study underscores the importance of expertise, advanced technology, and thorough planning in achieving successful outcomes in the utility sector.
Tell us the type of installation you need then mark the start and end points on our interactive map.
Case Studies
HDD Locations
Moling Locations
Website: in.house.media
EPS Trenchless Installations Ltd, Company number: 07739433, Registered office address: 55 Earl Street, Northampton, NN1 3AX Incorporated in England and Wales on 12 August 2011